Repair work to start at Elland Bridge - less than a month after it re-opened

Repairs are due to begin today (Monday) at Elland Bridge - less than a month after it re-opened following the Boxing Day floods 2015.

Yorkshire Water has instructed their Morrison Utility Services (MUS) to start work in Halifax Road near to Elland Bridge from Monday March 6.

The team from MUS are repairing a burst water main which is located in Halifax Road at the junctions with Park Road and Elland Bridge.

Hide Ad
Hide Ad

Work will start at approximately 7am and the repair team will be onsite for a maximum of six days.

During this time Park Road and Elland Bridge will be under two-way traffic light control.

Halifax Road will be under a Halifax-bound only road closure. No heavy good vehicle traffic or bus services will use Halifax Road during these six days.

Diversion signs will be in place throughout this duration of the work.

Elland Bridge was fully re-opened on February 8.

Related topics: