'No intention to operate' pledge from new owners of Calderdale waste incinerator site

New owners of a waste site in Calderdale have pledged they do not intend to operate an incinerator at the site, or any other it currently owns.

The prospect of a small waste incineration plant (SWIP) being operated at the Belmont site in Sowerby Bridge has seen campaigns by worried residents and politicians against the proposal running for years as well as public hearings on the issue in 2022 and 2023.

The company which used to own the site – Calder Valley Skip Hire (CVSH) – had won planning approval to operate the incinerator at the site following an appeal, after Calderdale Council refused permission.

But operation of the SWIP also requires an environmental permit and a first application for this was quashed following the 2022-23 hearings when planning inspector John Woolcock effectively refused the permit.

Councillor Adam Wilkinsonplaceholder image
Councillor Adam Wilkinson

A second application by the company was approved by the council but quashed earlier this year after a fresh judicial review challenge.

But Ellete Waste Ltd, which says it took formal ownership of the Belmont site from Calder Valley Skip Hire earlier this month, has made a pledge not to operate the incinerator.

In a statement, the company said: “Our intended use for the Belmont site is to receive general waste, process it responsibly, and maximise recycling.

“The focus of operations will be on waste segregation and recycling in line with current environmental regulations and best practice.

“We wish to make it absolutely clear that Ellette Waste Ltd has no intention of operating an incinerator at the Belmont site or any other site it currently owns.”

The company also owns the Mearclough site in Sowerby Bridge, and the statement also says it will be seeking to vary a recent application to allow hazardous waste and an increase in overall permitted tonnage relating to Mearclough.

“Ellete Waste Ltd will be seeking to remove hazardous waste from that application and reduce the proposed tonnage accordingly,” says the statement.

Campaign group against the incinerator, The Benbow Group, has cautiously welcomed the statement.

The group said: “This statement is welcomed and it is hoped that it brings an end to intentions to operate an incinerator at Belmont or Mearclough.”

On social media, ward councillor Adam Wilkinson (Lab, Sowerby Bridge) said: “Labour ward councillors cautiously welcome the announcement from Ellete Waste Ltd that there are now no plans to operate an incinerator at the Belmont site – something we know will reassure many residents who have been raising concerns and campaigning against incineration plans for over a decade.

“We are committed to working with the new owners in good faith to ensure the site is operated responsibly, transparently, and in a way that protects local people, the environment, and the character of our community.

“We will continue to engage closely, hold constructive discussions with local campaigners, and make sure residents’ voices are heard as plans develop.”

If you have a story to share, you can email our reporting team with details and a good contact telephone number at [email protected].

News you can trust since 1853
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice