North Bridge Leisure Centre is being partially demolished so that a new combined pool and leisure centre can be built.
The process involves stripping out internal fixtures and fittings, then using excavators and demolition equipment to reduce the building structure to ground level and remove the foundations.
Work started in September, with North Bridge car park closed until the new leisure centre is finished.
As these photos and video show, much of the original leisure centre has now gone.
Halifax has been without a swimming pool since 2020 and without its leisure centre since 2022, with the plan to build a new combined pool and leisure centre having to be put on hold for a year when inflation costs spiralled.
Work has since been restarted but with some cuts to what was originally planned and the estimated completion date for the new facility is now 2027.
The new Halifax Leisure Centre will include a120-station fitness suite, three multi-function studios and a dedicated spinning studio; an eight-court sports hall; a 25 metre six-lane swimming pool with spectator seating, and a learner pool with a viewing and seating area, wellbeing spaces; a soft play and adventure area for children; and a café and community area.
You can now get breaking news and top Courier stories sent direct to your phone by following our new WhatsApp channel at https://whatsapp.com/channel/0029Vb7RSfg6hENoQ1VDZK1H

1. Photos and video as Halifax landmark is demolished
Work underway to knock down parts of North Bridge Leisure Centre in Halifax Photo: Sarah Fitton

2. Photos and video as Halifax landmark is demolished
Work is underway Photo: Sarah Fitton

3. Photos and video as Halifax landmark is demolished
A new combined leisure centre and swimming pool will be build in its place Photo: Sarah Fitton

4. Photos and video as Halifax landmark is demolished
The car park at North Bridge Leisure Centre is closed while work is carried out Photo: Sarah Fitton