Every year Historic England produce a health-check of England’s most valued historic places and those most at risk of being lost forever as a result of neglect, decay or inappropriate development.
The list includes buildings and monuments that are at risk of falling into disrepair through disuse or inappropriate development.
Here are 19 Calderdale’s buildings and monuments that are on Historic England’s Heritage At Risk Register 2024.
Also on the list but not pictured are a barn to north west of Greenwood Lee, Widdop Road, Heptonstall, and four buildings or sites situated in Kirklees Park, Brighouse.
Some of the pictures are of the general area of the landmark for illustrative purposes.

5. Church of St James, Church Lane, Hebden Royd
Early C19 Gothic church, with additions by Richard Norman Shaw. The north slope of the roof was re-covered in 2016 with the support of a National Lottery Heritage Fund Grant for Places of Worship. A further NLHF grant for the re-covering of the south roof slope has been withdrawn, although some urgent repairs have been carried out. Photo: Google Street View

6. Church of St Michael and All Angels, Todmorden
A church by Charles Hodgson Fowler, built in 1902, with embattled west tower and octagonal spire. It is constructed from hammer-dressed stone with ashlar dressings. The vestry roof has recently been repaired. Some further work is needed to the south aisle roof and the tower. Photo: Google Street View

7. Wainsgate Baptist Church, Hebden Bridge
Former chapel with attached Sunday school and minister's house dating from 1859. The chapel is now wind and water tight following grant-aided repairs but the interior remains in very poor condition following prolonged and extensive water ingress and this is limiting the use of the building. Photo: National World

8. Scout Hall, Lee Lane, Halifax
Late C17 house. The interior has been converted and is occupied as a dwelling. The external stonework is in need of repairs. Photo: Google Street View

