Every year Historic England produce a health-check of England’s most valued historic places and those most at risk of being lost forever as a result of neglect, decay or inappropriate development.
The list includes buildings and monuments that are at risk of falling into disrepair through disuse or inappropriate development.
Here are 19 Calderdale’s buildings and monuments that are on Historic England’s Heritage At Risk Register 2024.
Also on the list but not pictured are a barn to north west of Greenwood Lee, Widdop Road, Heptonstall, and four buildings or sites situated in Kirklees Park, Brighouse.
Some of the pictures are of the general area of the landmark for illustrative purposes.

13. Broad Bottom Old Hall, Mytholmroyd
A rare and important example of an aisled timber-framed open hall dating to1464 and encased in stone in late C16. Watertight but vacant for some years and vulnerable to decay without a sustaining use. Old Hall was probably built for the Draper family, who were cloth merchants. The estate is typical of the post-medieval economy of the Calder valley combining small-scale farming with textile production. Tree ring dating, a historical and architectural survey and other project development is complete, with Historic England support, but the project has not gone ahead. Photo: Google Street View

14. Ackroydon
Ackroydon Conservation Area, Boothtown, Halifax Photo: Bruce Fitzgerald Photography

15. Ring of Stones
Ring cairn known as the Ring of Stones on Ringstone Edge Moor, 800 metres south of Upper Gosling Royd, Ripponden Photo: Bruce Fitzgerald Photography


