Every year Historic England produce a health-check of England’s most valued historic places and those most at risk of being lost forever as a result of neglect, decay or inappropriate development.
The list includes buildings and monuments that are at risk of falling into disrepair through disuse or inappropriate development.
Here are 13 of Calderdale’s buildings and monuments that are on Historic England’s Heritage At Risk Register 2023.
Some of the pictures are of the general area of the landmark for illustrative purposes.

13. Broad Bottom Old Hall, Mytholmroyd
A rare and important example of an aisled timber-framed open hall dating to 1464 and encased in stone in late C16. Watertight but vacant for some years and vulnerable to decay without a sustaining use. Old Hall was probably built for the Draper family, who were cloth merchants. The estate is typical of the post-medieval economy of the Calder valley combining small-scale farming with textile production. Tree ring dating and a historical and architectural survey have been completed. Historic England grant-aided Project Development is complete. Photo: Google Street View

