Huge 81-tonne drill arrives as progress on new Halifax leisure centre and swimming pool continues

A massive drill has arrived for the next phase of creating Halifax’s new leisure centre and swimming pool.

Work has been underway for several months to get the site – where North Bridge Leisure Centre used to be – ready for construction.

This has included site surveys and the partial demolition of the old leisure centre.

Now Calderdale Council says contractor Tilbury Douglas has officially begun work on the new build and a construction piling rig– a huge, specialised drill that will help create the foundations for the building – has arrived.

The piling rig on site as construction begins on the new Halifax leisure centreplaceholder image
The piling rig on site as construction begins on the new Halifax leisure centre

The rig, weighing 81 tonnes, will drill over 300 pile foundations (holes that will be filled with concrete) up to 13 metres down into the ground, to create structural support for the building.

Shelagh O’Neill, Calderdale Council’s director for Regeneration and Strategy, said: “The start of construction is a significant step forward for the Halifax leisure centre project, which is on track to deliver top-class sports, health and wellbeing facilities for all of Calderdale’s diverse communities in 2028.

“Teams have been busy finalising the detailed designs and doing lots of complex preparation work on site to reach this point, and creating the foundations is a vital first step in the actual construction.”

Halifax has been without a swimming pool since 2020 and without its leisure centre since 2022, with the plan to build a new combined pool and leisure centre having to be put on hold for a year when inflation costs spiralled.

There have been some cuts to what was originally planned and the estimated completion date for the new facility is now 2027.

The new leisure centre will include a 120-station fitness suite, three multi-function studios and a dedicated spinning studio; an eight-court sports hall; a 25 metre six-lane swimming pool with spectator seating, and a learner pool with a viewing and seating area, wellbeing spaces; a soft play and adventure area for children; and a café and community area.

If you have a story to share or an event you would like us to cover, email our reporting team with details and a contact telephone number at [email protected].

News you can trust since 1853
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice