Artist's impressions show what A629 will look like ahead of work starting on Eastern Corridor

Artist impressions show what areas of the east of Halifax town centre will look like once major work to the road network has taken place.

The A629 phase two Halifax town centre project – a four-year regeneration plan – aims to create new public spaces, improve accessibility, create areas where people can move around free of traffic and improve vehicle circulation around the town and public transport connectivity.

placeholder image
Read More
'Bear with us, we’re going to get there' - Message to residents as major work on...

Work has been taking place along the top of town, or the Western Corridor, since 2024.

A new layout for the junction of New Road, South Parade, Prescott Street, and Church Street.placeholder image
A new layout for the junction of New Road, South Parade, Prescott Street, and Church Street.

The next phase of work, planned for April 2026, will be at the bottom of town by Halifax Railway Station.

The Calderdale Next Chapter Facebook page shared: “Soon, we’ll be finishing work at the top of town in Halifax.

"Next up, construction will move east.

“At the bottom of town, we will be connecting Halifax Rail Station to the centre through a new town gateway, building a new section of road, and providing new routes to improve traffic flow.

A new crossing near Halifax Minster, and a new road layout to provide a smoother and faster route around the bottom of town.placeholder image
A new crossing near Halifax Minster, and a new road layout to provide a smoother and faster route around the bottom of town.

“Work on the east section will begin after the work on the west section is completed – as planned.

“We will be sharing information about diversions and temporary traffic lights in future posts, well ahead of the start of work - so you can plan ahead for your journeys in and out of Halifax.”

Planned changes to the layout include building a new road to the east of the Hughes Corporation building (the road will follow the old alignment of Church Street), creating an “open and welcoming” public space on the approach to the Piece Hall and a new crossing near Halifax Minster.

For details on A629 phase 2 visit www.calderdalenextchapter.co.uk

News you can trust since 1853
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice