Dating to 1823 the lock-up is a small two-storey building with coursed sandstone walls and stone slate roof. The roof covering and drainage is in very poor condition. North Halifax Historic Buildings Preservation Trust hopes to acquire the building by asset transfer from the Local Authority. A condition survey and options appraisal has been completed with grant from the Architectural Heritage Fund and a schedule of repair has been developed with grant from Historic England. A working party, organised by the Society for the Protection of Ancient Buildings, has carried out some holding repairs.placeholder image
Dating to 1823 the lock-up is a small two-storey building with coursed sandstone walls and stone slate roof. The roof covering and drainage is in very poor condition. North Halifax Historic Buildings Preservation Trust hopes to acquire the building by asset transfer from the Local Authority. A condition survey and options appraisal has been completed with grant from the Architectural Heritage Fund and a schedule of repair has been developed with grant from Historic England. A working party, organised by the Society for the Protection of Ancient Buildings, has carried out some holding repairs.

Heritage At Risk Register: Here are 13 of Calderdale's buildings on Historic England's At Risk Register 2023

Some of Calderdale’s most historic buildings and landmarks are at risk of being lost forever.

Every year Historic England produce a health-check of England’s most valued historic places and those most at risk of being lost forever as a result of neglect, decay or inappropriate development.

The list includes buildings and monuments that are at risk of falling into disrepair through disuse or inappropriate development.

Here are 13 of Calderdale’s buildings and monuments that are on Historic England’s Heritage At Risk Register 2023.

Some of the pictures are of the general area of the landmark for illustrative purposes.

News you can trust since 1853
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice